The reliable way to track billable hours for a field team is to record time against a job at the moment it happens, from the technician's phone, and add it up automatically per job, per person and per client. End-of-week paper timesheets lose hours because they rely on memory, and the hours they lose are almost always ones you could have billed.
Most HVAC, solar and engineering firms don't have a time-tracking problem so much as a time-recording one. The work happens, and nobody writes it down until Friday.
Where do billable hours go missing?
If you run teams on site, you can probably list the leaks already:
- The call-out that never made the timesheet. A technician stops at a client on the way back to the yard for a quick look at a tripping unit. Forty minutes, no job card, no hours.
- Travel nobody agreed on. Some contracts pay travel and some don't. If the technician doesn't know which, they either leave it off or the office strips it out to be safe.
- Rounded-down days. "Tue: 8h" covers a day that was actually 9.5 hours across two sites. The extra 1.5 hours belonged to a client.
- Waiting time. Waiting for the client's electrician to isolate the board, or for an inverter to arrive, is often billable on the contract and almost never recorded.
- Hours booked to the wrong job. Two jobs at the same client, one on a fixed price and one charged by the hour. Put the hours on the fixed-price job and they're gone.
None of this is dishonesty. It's what happens when the record is written days after the work, by someone tired, on paper.
What counts as a billable hour?
A billable hour is time spent on work a client has agreed to pay for. Which hours qualify depends on the contract, so write a simple rule for each contract type before you change how hours are recorded. Technicians then record what they did and where, and the rule decides what gets billed.
| Time | Charged by the hour (time and materials) | Fixed-price job | Maintenance contract (O&M or service agreement) |
|---|---|---|---|
| On site, working | Billable | Against the quote | Check the contract |
| Travel to site | If agreed | Against the quote | Often included in the visit fee |
| Waiting caused by the client | Billable if agreed | Extra, as a variation to the quote | Check the contract |
| Rework on your own mistake | Non-billable | Non-billable | Non-billable |
| Yard, training, admin | Non-billable | Non-billable | Non-billable |
O&M means operations and maintenance: the contracts solar firms and HVAC service companies run to keep equipment working after it's installed.
Record time per job, not per day
A daily total tells payroll what to pay. It tells you nothing about what to invoice. For invoicing you need hours per job, which means each person clocks on to a job when they start it and off when they leave.
On paper this is a nuisance, which is why nobody does it. On a phone it's two taps or one WhatsApp message:
On site at Karee Farm, inverter commissioning.
A back-office bot reads that, finds the open job, and starts the clock for that person. If the message could match two jobs, it asks which one. When they message that they're leaving, or tap "done", it stops. If someone is still clocked on at 19:00, it asks whether they forgot.
Payroll hours and billable hours are different numbers
Firms get into trouble when they treat these as one:
- Payroll hours are what you owe your people. In South Africa that's set by the Basic Conditions of Employment Act and, for many engineering and electrical trades, your bargaining council agreement, which can set its own rates and overtime rules.
- Billable hours are what you can charge clients. They come from the same clock-ons, filtered through the contract rules above.
Recording time per job gives you both from one source. Payroll gets each person's total for the week. Invoicing gets each job's billable total, already split by client.
What changes when hours are recorded properly?
- Invoicing. When a job is signed off, its billable hours are already there. Nobody has to chase the technician for a timesheet first. More on invoicing jobs the same day they're signed off.
- Quoting. After a few months you know how long a split-unit install or a 100 kWp rooftop actually takes your team, not how long you hoped it would. That makes the next quote faster and more accurate.
- Spotting overruns early. If a job quoted at 40 hours has used 35 and isn't half done, the admins can hear about it on day three, not when the invoice comes out at a loss.
How to start without new software
- Write the billable rules for your three or four most common contract types.
- Give every live job a number your team can refer to, even if it lives in a spreadsheet.
- Move clock-on and clock-off to the phone. A WhatsApp or Telegram bot works because your team is already on those apps and nobody has to learn a new one.
- Send the totals automatically: per person to payroll, per job to whoever invoices.
If your jobs already live in job management software, the bot can write the hours straight into it, provided the software lets other tools connect. If they live in spreadsheets and group chats, our field operations web app gives them one home, and the bot runs on top of it.
The short version
Billable hours get lost between the work and the record. Close that gap by recording time per job, on the phone, when it happens, and let the rules for each contract decide what's billable.