To quote HVAC and solar jobs faster without underpricing them, build every quote from three things you write down once: a current price list, standard labour times for each job type, and the actual hours and materials from jobs you've already done. With those in place, most quotes are assembly rather than estimation, and a bot can draft them for a person to check and approve.
Why are quotes slow?
For most contractors, every quote is built from scratch. The person quoting:
- looks up current supplier prices, often in a few different places,
- estimates labour from experience,
- remembers what went wrong on the last similar job and adds a bit,
- types it all into a template.
That only works when the one person who knows all of it has time. When they're on site, quotes wait, and the client is usually asking other contractors too.
Why do contractors underprice quotes?
Quotes built from memory tend to come out low, for predictable reasons:
- Labour is estimated, not measured. "A split-unit install is a day" holds until you count the second trip for the electrician.
- Supplier prices move. Equipment prices change between quotes, and a price list updated last quarter quietly eats your margin.
- Small items get forgotten. Brackets, trunking, isolators, consumables, travel.
- Site conditions aren't priced. Second-floor access, long cable runs, roof type and distance from the yard all add time.
Build quotes from three written-down things
1. A price list you trust
Units, materials and consumables, with your cost and your selling price, in one place, with a date on it. A fast quote from an old price list is still wrong.
2. Standard labour times per job type
Write down how long each common job should take your team: a 9 kW split-unit install, a standard service visit, a 50 kWp rooftop, an inverter swap. Then list the site factors that change it: floors, roof type, distance, access.
3. What past jobs actually took
Most firms skip this step, and it's the one that stops underpricing. If you record hours per job and book materials to each job, you can compare what you quoted with what it really took. After a few months, your standard labour times stop being guesses.
A worked example
This is an illustration, not a real client's prices. Request: two 9 kW split units in an office on the second floor.
| Line | How it's worked out | Amount |
|---|---|---|
| 2 × 9 kW split units | From the price list | R31 800 |
| Install labour, 14 h | Standard 6 h per unit, plus 2 h for second-floor access, at R650/h | R9 100 |
| Pipework, brackets, trunking | Standard materials for this job type | R4 250 |
| Subtotal | R45 150 | |
| VAT at 15% | Only if you're VAT registered | R6 773 |
| Total | Valid for 14 days | R51 923 |
Every line comes from something written down. The only judgement call is the access factor, which is exactly where the person approving the quote should look hardest.
Where a bot fits
Once those three things exist, a back-office bot can draft a quote from a short message:
Quote: 2 split units, Durbanville office, 2nd floor.
It picks the units from your price list, applies the standard labour time with the access factor, adds the usual materials, works out VAT, and sends the draft to whoever approves quotes. A person checks it, adjusts anything site-specific, and approves it. Only then does it go to the client. When the job is done, the same records turn into the invoice: see invoicing the same day.
The bot shouldn't decide discounts, judge whether a site is unusual, or send a quote nobody has checked.
A quick checklist for every quote
- Is the price list dated within the last month?
- Is the labour time based on your actual past jobs?
- Have you priced access, distance and site conditions?
- Are consumables and small materials included?
- Is VAT shown correctly, and does the quote say how long the price is valid?
- Has someone who knows the site approved it?
The short version
Fast, accurate quotes come from written-down prices, standard labour times and the real numbers from past jobs. With those in place, a back-office bot can draft a quote in minutes for a person to approve.